FY2025/26 · Determinations, not approvals or construction starts. Council: count, assessment time and rank. NSW Planning Portal: reported development costs.Council snapshot ↗
DA value: source & coverage
A$850,389,423.72 in recorded estimated development costs for Newcastle DAs determined between 1 July 2025 and 30 June 2026. Of 1,018 applications, 980 reported positive costs and 38 recorded $0; none had missing or invalid cost fields. No value has been assigned to zero-cost records.
The total uses the NSW Planning Portal’s reported cost field without adjustment. It covers determinations, including outcomes other than approval, and excludes modifications and reviews. These are application estimates, not actual construction spending. Source checked 28 September 2026; records may be revised.
Newcastle · last five years · monthly new development applications
September 2021 – August 2026 · 60 complete months
On smaller screens, scroll sideways to see every month.
Source checked 28 September 2026. Checking for an update…
View figures & definitions
Newcastle new DA determinations
Month
Determinations
September 2021
124
October 2021
126
November 2021
140
December 2021
156
January 2022
49
February 2022
98
March 2022
126
April 2022
83
May 2022
146
June 2022
128
July 2022
122
August 2022
153
September 2022
93
October 2022
84
November 2022
121
December 2022
108
January 2023
61
February 2023
83
March 2023
102
April 2023
81
May 2023
106
June 2023
102
July 2023
93
August 2023
107
September 2023
89
October 2023
95
November 2023
96
December 2023
96
January 2024
81
February 2024
79
March 2024
91
April 2024
90
May 2024
99
June 2024
71
July 2024
108
August 2024
78
September 2024
70
October 2024
96
November 2024
99
December 2024
90
January 2025
61
February 2025
88
March 2025
87
April 2025
81
May 2025
81
June 2025
83
July 2025
92
August 2025
99
September 2025
108
October 2025
101
November 2025
72
December 2025
96
January 2026
48
February 2026
63
March 2026
76
April 2026
83
May 2026
85
June 2026
95
July 2026
96
August 2026
93
New Development Applications with status “Determined”, grouped by determination date. Modifications and reviews are excluded. Determinations include outcomes other than approval and are not construction starts. Records may be revised by the source.
This chart checks the NSW feed when opened. Results are cached for up to 24 hours. The annual Council snapshot above is a separate reporting series.
A June 2026 paper by WSP engineers Saman Zargarbashi and Alireza Foroughi documents the performance of open-ended steel tubular piles supporting the Windeyers Creek bridge on the Heatherbrae bypass.
Read article & sources
The piles measured 1,150 mm and 1,250 mm in external diameter and extended more than 60 metres through layered ground.
The authors report:
Different driving behaviour between neighbouring piles in broadly similar ground, associated with differences in soil plugging.
Increased shaft resistance during restrike tests conducted four to eight days after installation.
Reduced toe resistance in some piles terminating in siltstone.
Cases where available hammer energy appeared insufficient to fully mobilise toe resistance during dynamic testing.
The study compares design predictions with PDA testing and CAPWAP analysis, documenting both the results and limitations of interpretation.
Newcastle councillors voted unanimously on 22 September 2026 to commence a planning proposal introducing a geotechnical planning clause and landslide risk map into the Newcastle Local Environmental Plan 2012.
Read article & sources
The proposal follows the May 2025 New Lambton landslide. Council says the proposed controls would require landslide risk to be considered when assessing development on land identified as potentially susceptible to future movement.
Council’s stated next steps include submission for a State gateway determination and, subject to approval, public exhibition.
Separate investigations are informing the design of long-term stabilisation works. Council’s September updates describe boreholes up to 20 metres deep, with stabilisation planning continuing into 2027. The extent of the required works will be determined through detailed design.
A civil works company was convicted and fined $25,000 following a trench collapse during sewer works in Port Macquarie. SafeWork NSW announced the outcome on 26 June 2026. The incident occurred on 14 February 2023 and injured a worker.
Read article & sources
The sentencing judgment records that the company had a safe work method statement, conducted daily toolbox talks and had used benching, battering and shoring boxes during the project.
The established offence concerned a specific interval: workers were not expressly prohibited from entering the trench while the required shoring boxes were being retrieved.
The court recognised the limited scope of the offending, the company’s previous record and improvements to its safety systems. SafeWork’s announcement noted the company’s right to appeal.
City of Newcastle reports that embankment stabilisation has been completed at two locations along Shortland Esplanade, below Fort Drive near Nobbys Beach kiosk and opposite the Cowrie Hole.
Read article & sources
The council project page describes soil nailing, concrete piled retaining walls, revegetation and improved stormwater controls.
A further section of soil nailing immediately north of the completed area near Newcastle Ocean Baths is scheduled to start in mid-2027.
Heavy Foundations completed the cased bored wall piles for Lawcon.